Core Networking Upgrade

Hy guys, in the upcoming 2 weeks we will conduct various upgrades to our core routing infrastructure. We will also implement a 3'rd backup line.
During this time, in rare occasions you might encounter connectivity time-outs, in the number of seconds at most, this will be due to the update of BGP Routes.

We apologize for the inconvinience.
Complete node's upgrades are also scheduled between 18-DEC-2023 and 21-DEC-2023.
We will get back with the exact date of the 1 our downtime for the node's.
HOST-C.

Comments
why do i feel like you are a hot chick who entered the room
and the perfume make me horny for hours
lets see if i score with your next xmas offers
Because your core is weak and turned by a pretty face.
HA HA HA, I like you, just keep your pants on for a while, promise?
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
Don't speak bad words to our Core Router, she will be upset and kernel panic
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
my knees shake when i see some flesh routers
this always plays
NAAAA
I am more of a:
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
Prettiness is fleeting it is the core that matters.
Hmmm, Core, remember these?
Max. CPU clock rate 733 MHz to 2.66 GHz
FSB speeds 266 MT/s to 6.4 GT/s
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
Vividly
I am just playing my man if you took offense I apologize sincerely.
I like messing with a pantless @ehab tis fun for me.
I know, there is no offense to be taken, I actually like having a fun/relaxed discussion, in any post we do.
By the way, what does Retired mean, I did not get that one
That is why I asked him this time, to try to leave the pents on, I am amazed he managed to keep it for so long out of a reply for to me....

Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
Usually reserved for people that have voluntarilly left and deactivated their account. Mine tag is a bit different it means no more partying for Yeti.
Yeah he likes to have a pants off dance off and it is not a bad thing usually.
@ehab
Something like
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
Pretty much
Hy,
So phase 1 completed, SRV maintenance and so on, cabling and stuff.
Phase 2 will be this week, the one with the 1 our downtime, we will announce when in the next 48h.
Until Now:
best free image uploading site
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
Hy, on 21-dec-2023 10:00AM to 11:00 AM CET ( Central Europe Time ) we will do the offline upgrades, during this time, all services will be stopped. We will announce when we finished the necessary maintenance.
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”
OK, Maintenance done, we passed the projected downtime as a result of Server Motherboard Firmware Upgrades that went slower than anticipated.
Node upgrades were done 1 by 1, to minimize downtime.
All services are up. Billing platform upgrade will be done next week, but that will not affect running services.
We thank for your patience.
Host-C
Host-C - VPS & Storage VPS Services – Reliable, Scalable and Fast - AS211462
“If it can’t guarantee behavior under load, it doesn’t belong in production.”